The E.W. Brown project required HTA to blast an area for the placement of a new FGD unit. Blasting had to take place 35’ away from generating unit 1. Blasting was also required under main transmission lines from the plant. These shots were required to be covered with blasting mats. Seismic vibrations were constantly monitored with seismographs in the plant itself, around the exterior and around towers.